The project consists of a 34 Km length road; 14 Km of secondary roads and ramps, 6 intersections; 30 current structures (drainage dock, pipe, channel, etc.); 8 viaducts, successive cantilever: L 520m, width 2x17m (2x2 lanes); a 1,300m tunnel; and retaining walls (4500m).